This job ad has been posted over 40 days ago...
2
applicants
millwright
at Earlwin C. Dona in Saudi Arabia
Earlwin C. Dona
190 fajardo St.Canalate,Malolos,City
Contact No:09173852598
_____________________________________________________________
PERSONAL DATA:
Date of birth: August 24,1985
Place of birth: Manila
Sex: Male
Civil Status: Single
Nationality: Filipino
Height: 5’9
Weight: 65 kg.
EDUCATIONAL ATTAINMENT:
Primary level:
Atlag Elementary School S.Y 1992-1997
Atlag Malolos ,Bulacan
Secondary level:
Marcelo H.Del Pilar High School S.Y 1998-2002
Sta.Isabel,Malolos,Bulaca
Tertiary level:
Dr.Yanga’s Colleges Undergraduate
Employment record:
Company: AG&P
Atlantic Gulf And Pacific Company of Manila
Position: Millwright
JOB DESRIPTION/DUTIES AND RESPONSIBILITIES
> Installation of compressor, pumps,and steam turbine
> Alignments of pumps,compressor by using reverse
alignment method
> Assist to the inspector for inspection of static and rotating
equipment
> Assembly of Boilers
> Alignment of Boilers
> Alignment of gas turbine and installation of filter house
> Assembly and Disassembly of pumps
> Assembly of air fin coolers
> Installation,leveling, and layout of rotating equipment
190 fajardo St.Canalate,Malolos,City
Contact No:09173852598
_____________________________________________________________
PERSONAL DATA:
Date of birth: August 24,1985
Place of birth: Manila
Sex: Male
Civil Status: Single
Nationality: Filipino
Height: 5’9
Weight: 65 kg.
EDUCATIONAL ATTAINMENT:
Primary level:
Atlag Elementary School S.Y 1992-1997
Atlag Malolos ,Bulacan
Secondary level:
Marcelo H.Del Pilar High School S.Y 1998-2002
Sta.Isabel,Malolos,Bulaca
Tertiary level:
Dr.Yanga’s Colleges Undergraduate
Employment record:
Company: AG&P
Atlantic Gulf And Pacific Company of Manila
Position: Millwright
JOB DESRIPTION/DUTIES AND RESPONSIBILITIES
> Installation of compressor, pumps,and steam turbine
> Alignments of pumps,compressor by using reverse
alignment method
> Assist to the inspector for inspection of static and rotating
equipment
> Assembly of Boilers
> Alignment of Boilers
> Alignment of gas turbine and installation of filter house
> Assembly and Disassembly of pumps
> Assembly of air fin coolers
> Installation,leveling, and layout of rotating equipment
Published at 06-06-2009
Viewed: 315 times
Viewed: 315 times

