This job ad has been posted over 40 days ago...
0
applicants
Manufacturing Supervisor Production Welding&Fabrication
at NONE in USA
OIL AND GAS /MANUFACTURING
OFF SHORE/ON SHORE /POWER PLANT
TURBINE /WELDING/FABRICATION
OVER SEAS & INDIA APPOINTMENT
GULF RETURN
Sangadi Varahala Raju,
H.NO-62-3-5/1, Sriharipuram,
New Ramalayam Street,
Malakhapuram, Post
Visakhapatnam-530011(AP)
India
Mobile# 0091 9940503332
Email: raju.varahala@rediffmail.com
Email; loveraj.sangadi@gmail.com
Educational Qualification:
SSC Board From govt. of Andhrapradesh
DME IIET From Recognized D.E.&T. (Govt. of Andhrapradesh)
Technical Qualification: NDT LEVEL-2 QUALITY
FABRICATION AND WELDING
PIPING & STRUCTURAL
Welding & Fabrication (I.T.I) from Govt. of Andhra Pradesh
Training : In Hindustan Shipyard Vizag (A.P) Welding and Fabrication Ship repairs, Dock yard ships Piping & Structure,
Total Work Experience: 10 Years. (India 4 years/Gulf 6 years
Previous Employer: L&T Oman LLC, Sultanate Of Oman.
Client: Occidental Ltd, USA.
Project Details: De-salination Water Treatment Project
Mechanical Vapour Compressor System (MVC)
Capacity; 7700 Gpm.
Nature of Job:
Position Held: Mechanical, Pipeline Welding Construction & Erection
Construction and Commissioning of 7 Trains of Falling Film Evaporators including Mechanical Vapour Compressors, Mist Eliminators, Recirculation Pumps. Erection as well as Welding of Super Duplex, Duplex, SS 316 piping etc.
Responsibilities:
Past Experience:
S.No Name of the
Organization Period of Service Position Held
1
INTER GRATED INSTITUTE OF EDUCATION TECHNOLOGY April 2005 to april. 2009 (DME)As A Diploma Mechanical Engineering From IIET Training Instute Hyderabad Rec, Govt,of AP,
2
AL SHIRAWI EQUIPMENT CO.(L.L.C)
DUBAI(UAE) 13/10/2002
to 02/03/2005 MIG Co2, 3G,FCAW, Trailers, tippers, bullkers, vessels working (Xray 100%Quality Job
3
OMAN NATIONAL ELECTRIC CO. LLC MUSCUT(OMAN) 07/09/2000
to 20/01/2002 ARC 6G MIG Oil Storage Tanks, Quality Jobs, Gouging & Grinding
4
EMIRATES BUILDING SYSTEM (LLC) DUBAI(UAE) 22/08/1997
to 20/05/1999 ARC 3G,MIG, FCAW Heavy Structure works ‘X’ Ray jobs, Gouging & Grinding
5
Hindustan Ship Yard Ltd.,
Vishakhapatnam. 03/05/1993
to 30/06/1994 ARC 2G, 3G, 4G & MIG Ship Dry-dock repair works,And 6G.ER6010,ER7018
SAIPEM (ERSAI) KHAZAKASTAN
OFF SHORE PIPE RACKS & NDT INSPECTION AS A WELDING FOREMAN FROM 03/11/2008 TO 22/01/2009( Short Term Project shed down) Daily lead Welders production Pipe line Material CS,SS,CouperNicle,cuni,
UB ENGINEERING,CO LTD VIZAG STEEL PLANT (RINL)
AS A QC WELDERS AND FABRICATION, SS,CS, SUPERDUBLEX, PIPING
AND EXTRA …
PREVIOUS EMPLOYER; VIZAG STEEL PLANT (AIR LIQUID PROJECT)
Organization U B Engineering Limited.
Project Air Liquid Project in Vizag Steel Plant (RINL)
Visakhapatnam, Andhra Pradesh
Designation Mechnical & QA,QC,Welding Superident
Period 11-feb-2010 to 05-04-2011
PRESENT WORKING
TOSHIBA-JSW Turbine & Generator Pvt.Ltd
A group of MNC in JAPAN.
As a Shop Flore production engineer marinating the all welding equipments, and manufacturing processes, regular maintains daily duty hrs ,shift timings changing and all.
.
a) As an independent Welding,Fabrication,Mechanical SUPERVISOR handling complete execution of day-to-day activities handling a team of contractors, fabricators. Following are the major assignments
a) Co-ordination with Client for the site requirements for technical related issues such as drawings for construction, confirmation and compliance of specification requirements of equipments supplied at site as per clients requirements, inspection of materials dispatched at site and all other relevant activities concerned with an EPC Contract.
b) Technical discussions for site sub contractors for site fabrication and site erection
c) Following project execution schedule at site, distribution assignments to concerned team of contractors and fabricator.
Skilled Performance in Steam Turbine and Gas turbine parts Manufacturions a
and Repairs and maintenance. in Turbines Division.
Responsibilities :
• Product development – Identification of manufacturing processes & technology and providing technical support to the manufacturing (Capacity planning, Manpower estimation…)
• Facility planning – Identification of machining centres, toolings, material handling systems to achieve the optimum deliverables
• Project Management strategy (Business case proposal, adhering to the schedule, conducting weekly reviews, distributing the work to subordinates…etc)
• Co-ordinating with other divisions for the work to be done to achieve our organization goals, communicating the technical info to the internal customers, providing technical support to the other divisions
Tasks:
Suitably manages the synergies of team members and equipment used in order to optimise the
human and technical resources one is in charge of.
Organises, manages and co-ordinates the work of welders during various welding techniques,
ensuring compliance with quality and safety procedures and standards.
Ensures total understanding and implementation of all major contract requirements and project
specifications.
Checks the use and storage of all welding material and equipment.
Supports the QC supervisor and NDT operators in controlling and maintaining quality standards and
identifies any tendencies for anomalies and defects to occur.
Monitors welding parameters and report any deviations to the superintendent or assistant.
Provides for the training of welders/operators
Published at 29-11-2011
Viewed: 212 times
Viewed: 212 times

